You can create a project from scratch or duplicate an existing one. Folder and WBS templates give every project the same structure from the start.
Without the Custom access control add-on every user is Admin and can create and duplicate projects. With the add-on you need the Admin user type, or the Create Project tick under System Access. See Users. Edit mode must also be on. Without the permission or edit mode, Triark EDM does not show the Project and Duplicate buttons.
Create a new project
- Select Projects in the left menu.
- Turn on edit mode (the switch top right, or F2).
- Click Project in the toolbar. A panel opens on the right.
- Under Info, fill in Number and Name. Both are required.
- If you want a folder structure, select a Folder Category and a Folder Type under Folder Template.
- If you want a WBS, select a WBS Category and a WBS Type under WBS Template.
- Under Category & Status, select one or more Categories.
- Select a Status.
- If needed, add a Status Description.
- Click Save. The arrow next to it lets you choose what happens next: Save and New, Save and Open or Save and Close.
Triark EDM creates the project with the structures from the templates that you selected.
| Field | Description |
|---|---|
| Number | Project number or reference. It must be unique across your company. Required. |
| Name | The project name. Use a clear, descriptive name. Required. |
| Folder Category / Folder Type | The folder template, and the variant of it, for the project's documents. If you select a category, the type is required. |
| WBS Category / WBS Type | The WBS template, and the variant of it, for phases or deliverables. If you select a category, the type is required. |
| Categories | The project type, for example Customer, Internal or Testing. You can select more than one. |
| Status | Where the project stands, for example In Progress or Done. The list shows the statuses that belong to the categories you selected. If you change the categories, the status is cleared. |
| Status Description | More detail about the status. You can fill it in once a status is selected. |
You fill in the installation, customer reference, description and dates afterwards, in the project's Info tab. See Project info.
Templates
Your company creates folder and WBS templates under Standard → Project → Folder Templates and WBS Templates. A template has a category and one or more types: variants that include more or fewer of the folders or WBS elements. See Folders, WBS and zones.
- Templates are optional, but they give every project the same layout.
- You can only apply a template when you create the project. After that, you add folders and WBS elements one at a time, or import many at once from an Excel workbook.
- The project gets its own copy of the structure. If you edit the structure in the project, the template does not change. If you edit the template, the change only affects new projects.
- There are no templates for zones. You build the zone structure in each project.
Set up the structure before the documents arrive. It takes much longer to file many existing documents into a structure that you make afterwards.
Duplicate a project
Duplicate a project to save time when a new project is similar to an existing one. An example is a new order for a customer with the same delivery model. It copies the structure, which is the part that takes longest to rebuild.
- Turn on edit mode (the switch top right, or F2).
- Select the project in the project list.
- Click Duplicate in the toolbar. You can also right-click the project and choose Duplicate Project.
- Enter a new Number. It must be unique.
- Under Options, tick what to copy: Info, Status, Companies, Persons, Folder Structure, WBS Structure, Zone Structure and Documents.
- Click Duplicate.
You can only copy Persons together with Companies. Triark EDM only copies documents if you tick Documents. Otherwise the new project starts without documents.
